|
Some checks are pending
ci / test (push) Waiting to run
Update the changelog, status, handoff, verification register and VM boot record with the 2026-09-22 graphical journey work: the fixed step sequence, the interaction-defect fixes (readiness refresh, catalog sync/staleness, AI revalidation, keyboard suggestion navigation, truthful keyboard-step label, link vs service readiness, busy/failure handling), the new gui-install harness mode, and the final-ISO results. The gui (28/28) and opencode (18/18) journeys pass; gui-install passes every journey assertion and starts a real install, but the four-hour harness timeout fired during the kernel build (base packages ~116 min), so two completed fresh-disk graphical installs + detached boot remain BLOCKED on host build time, not on a code defect. |
||
|---|---|---|
| .. | ||
| adr | ||
| screenshots | ||
| ARCHITECTURE.md | ||
| BASH-MIGRATION.md | ||
| CHANGELOG.md | ||
| CONTRIBUTING.md | ||
| DEVELOPMENT.md | ||
| FINDINGS.md | ||
| GIT-WORKFLOW.md | ||
| HANDOFF.md | ||
| OBJECTIVES.md | ||
| OPENCODE.md | ||
| PLAN-DEBIAN-LIVE.md | ||
| ROADMAP.md | ||
| STATUS.md | ||
| VERIFICATION.md | ||
| VM-BOOT-VERIFICATION.md | ||