phoebus_os/installer-rs/crates/phoebus-installer/src
Phoebus 1d37fbc1b8 ci(release): fail closed and bind gates to the candidate artifact
Make a passing CI/release result mean the checks actually ran.

- .forgejo/workflows/ci.yml is fail-closed: it provisions the pinned
  toolchain or fails, then runs one 'make ci' (fmt-check, clippy, workspace
  tests, VM-harness safety tests, release build, static installer build).
- Pin stable Rust 1.93.1 in installer-rs/rust-toolchain.toml; run cargo gates
  with --locked for reproducible dependencies.
- phoebus-release gates now records passed/failed/blocked/skipped/not_run
  (only passed is a pass), executes real host gate commands, and imports the
  existing VM-harness results.json instead of a competing harness. Gates with
  no automation are always blocked.
- Bind gate reports and harness evidence to a candidate name+SHA-256
  (--candidate; PHOEBUS_VM_ARTIFACT[_SHA256]); stale or unbound evidence is
  failed, never passed.
- publish refuses unless the report is candidate-bound and all-passed, the
  manifest verifies the artifact and a detached signature verifies; atomic
  publish preserves and restores the previous release on failure.
- vmsafety.Results records the verified artifact digest; 3 new Python tests.
- 20 new Rust regression tests; ADR 0012 and docs updated.

Verified locally: make ci (364 Rust tests, 19 harness tests, release and
static builds) exit 0; static binary is static-pie linked. CI runner, VM and
model gates remain unexecuted here.
2026-09-22 07:34:27 -07:00
..
bin ci(release): fail closed and bind gates to the candidate artifact 2026-09-22 07:34:27 -07:00
ai_guide.rs feat(installer): require AI to install; add local provider 2026-09-20 14:41:53 -07:00
gui_bridge.rs fix(installer): do not discard the validated AI state on unrelated edits 2026-09-22 04:13:31 -07:00
lib.rs feat(installer): graphical welcome and install wizard over a typed bridge 2026-09-21 13:13:40 -07:00
main.rs feat(installer): wire OpenCode into the GUI, CLI and sys ask 2026-09-22 02:36:29 -07:00
orchestrate.rs fix(executor): revalidate the target disk before partitioning 2026-09-21 20:01:32 -07:00
release.rs ci(release): fail closed and bind gates to the candidate artifact 2026-09-22 07:34:27 -07:00